
Add to Cart
1. Introduction of Product
No leakage material 385KW 1500kg/h 160L High Output Banbury Internal Mixer For PVC
Name:Banbury Mixer
Heating Way:Oil Or Steam
Type:Drop door Or Internal
Feature:It is mainly used for plasticizing, mixing and final mixing the stock
Rotors:Chrome Plated and Alloy Hardfacing Electrodes
Certificate:ISO,CE
2. Description:
1 Mixing volume of mixing cabinet 160L
2 Main motor power: 385KW, 8P, AC, Siemens brand
3 Rear rotor speed: 42 rpm
4 Ratio of front and rear rotor speed: 1:1.15
5 Blanking door type: downward
6 Colling type: water
7 rotor shaft: biserial self-aligning roller shaft
8 Electrical control: controlled by PLC, brand of Mitsubishi.
9 the decelerator with hard-facing gear makes it's transmission steady, least noisy and everlasting.
10 Rotor: edges and corners are wearable, welded by welding rod
11 discharge door can be openned when poweroff
12 Contactor: LG brand
13 Equipped with the banbury mixer: hydraulic station,libritorium,DOP oiling device,Electric control cabinet,operating console
3. Equipment list
1 Main body 1 group
2 Press hammer and cylinder 1 group
3 Material feeding device 1 group
4 Discharge device 1 group
5 Transmission device 1 group
6 Electric control device 1 group
7 Ol pressure and lubricate device 1 group
8 Tubing 1 group
4. Applications:
1 | PVC Artificial Leather |
2 | PVC film |
3 | PVC plastic sheet |
4 | PVC plastic floor |
5 | Plastic mixer |
6 | Rubber mixer |
5. Main Technical Parameter:
Project Model | S-75L | S-100L | S-120L | S-160L |
Working capacity of mixing chamber (L) | 75 | 100 | 120 | 160 |
Rotating speed of rear rotor (r/min) | 1:1.17 | 1:1.17 | 1:1.17 | 1:1.17 |
Main motor power (kw) | 160 | 220 | 300 | 400 |
Pressure of compressed air (MPa) | 0.6 | 0.6 | 0.6 | 0.6 |
Weight (t) | 22 | 24 | 28 | 32 |
Overall dimensions(mm) | 5100×2200×3000 | 5500×2300×3200 | 5650×2350×3300 | 5800×2500×3450 |
6. Competitive Advantage:
Banbury mixer is the best machine for mixing of big quantity plastic and rubber material.
1. The diversity of rotor type can meet different mixing requirements.User can choose any kind of rotors(the mixer with different rotor has different total volume and working volume.
2. Drive sysyem adopts DC motor or AC inverter motor to realize stepless speed adjustment or adopts Acmotor with gear box etc.The drive system has the advantages of steady drive,lower noise and long service life etc.
3. The standard rotr adopts the right drive system.According to users needs we also can supply the left drive system.
4.Drive sysyem adopts DC motor or AC inverter motor to realize stepless speed adjustment or adopts Acmotor with gear box etc.The drive system has the advantages of steady drive,lower noise and long service life etc.
5.On-site operation cabinets and electrical control cabinets adopt PLC communication,results in reduction of equipment troubles and installation cost.
7. Service:
1. Oversea installation guide.
2. Oversea test running
3. Oversea worker training
4. Technical support
5. supply of spare parts
6. Technical operation support
7. Formula and processing support
8. Option
Two rotors mixer the relative rotation, the material from the feed mouth clamp into the roll gap by rotor extruding and shearing, after() through the roll gap above the top tied pien is divided into two parts, respectively along the chamber wall and the gap between the rotor before and after the return to roll gap above.In a week around the rotor flow, material is influenced by the shear and friction action, make rubber temperature rise sharply, lower viscosity, increased the wettability on the surface of the rubber in the compound, make good contact with rubber and compound surface.
9. Other Items
1. Payment: 30% by T/T as advance payment, balance(70%) by T/T
before shipment
2. Lead Time: 75 days after receiving the advance payment
3. Transportation: container, simple package ( PE film, salver)
4.Warranty period: From the day of the use of the machine in the buyer’s
factory:
(1) The mechanical Parts: 12 months
(2) The electrical Parts: 6 months
5. Installations and Commissioning
(1) Up to date commissioning has been made before shipment
(2) Overseas Commissioning and charges
one or two technicians will be sent to the buyer to guide the
installation and commissioning of the equipment if the customer
requests.
Customers pay the charge of our technicians.
(1) Round-trip Airplane Ticket
(2) Charges of transportation, accommodation and communication
(3) The allowance for the technicians is USD 80 per day for one
person.
(4) An interpreter is needed.