
Add to Cart
185 KW Two Stage PVC Plastic Pelletizing Line 60rpm , Pellet Maker Machine
Application: | PVC | Depth Of Nitration Case: | 0.5mm - 0.8mm |
Hardness Of Nitration: | 950-1020HV | Linearity Of The Screw: | 0.015mm |
Materials: | 38CrMoAIA, 9Cr18MoV | Product Name: | Planetary Roller Extruder |
3 KW Two Stage PVC Plastic Pelletizing Line , 950-1020HV
Description:
1. Depth of nitration case:0.5-0.8mm
2. Hardness of nitration: 950-1020HV
3. Materials: 38CrMoAIA, 9Cr18MoV
4. Application:PVC
5. Fragility of nitration: Less than grade 1
6. Roughness of the surface:Ra 0.4um
7. Linearity of the screw:0.015mm
8. Chromium-plating layer thickness:0.03-0.08mm
9. The surface hard chromium plating hardness after nitrogenation:>=950HV
10 . Guarantee: Common Nitrided: approx 2 years Bimetallic : much longer lifetime
Applications:
Mainly used in the production of sheet, card, film and other plastic products industry.
Configuration:
A. PRE-255 PLANETARY ROLLER EXTRUDER 1SET
(1). Planetary roller section: main screw 1 pc; planetary roller 12 pcs, knife
plate 1 pc, gear tooth sleeve; And this section is jacket-designed, which
can get through by heating oil; The main screw is core-drilled, heated by
oil; And the head of machine is cooled down by water;
(2). Section of material feeding, jacket-designed, water cooling.
(3). Feeding motor power: 3 KW;
(4). Hard-toothed gear box, Chinese famous brand;
(5). Inverter motor, AC, 185 KW;
(6). Stainless steel hopper, capacity of 200 kg;
(7). Metal detector( brand of S + S) is equipped on the top of the hopper;
(8). Rotating speed of main screw: 0 – 60 rpm, speed is adjustable;
B. SJ-300 SINGLE SCREW EXTRUDER 1SET
(1). Barrel and screw material is 38CrMoAlA
surface is nitride treatment (HRC 68-72),
L/D: 6:1, rotating speed of the screw is 0 -75 rpm, adjustable speed;
Temperature control type: cast aluminum heater and fan cooling;
(2). Hard-toothed gear box, Chinese famous brand;
(3). AC inverter motor, 132KW;
(4). Head of the extruder is equipped with pressure/temperature indicator
Installing & debugging service:
1. After the contract is confirmed, the seller will supply the plan of the workshop, foundation chart and the chart of rubber roller, square axes & all kinds of rollers. All operation manual will be supplied by seller, too.
2. The seller will send 3-4 technical workers to guide installation and debugging for buyer;
3. The buyer should supply the spare pipes and electric wires, and the seller just advices the specification or the model of them.
Other terms:
1. Delivery period: totally 6 months after the contact is confirmed.
2. Payment: 30% of the total amount by T/T in advance as down payment, 70% of total amount by T/T before shipment.
3. Spare parts: The seller will provide a set of valueless vulnerable parts for free. The seller also suggests the buyer to buy a set of spare parts which meets one year’s use again. The seller will show the list of spare parts to the buyer for his choose before delivery.
4. Appearance and color: appearance and color of the machines are based on the seller’s standard. Of course, we can also custom-made according to buyer’s request.
5. Electric power: The quotation above is based on 380V/50Hz. There will be some additional fee and extended producing time for custom-built electric power requirement.
6. Warranty period:
6-1. Machines: one year after successful debugging;
6-2. Electrical components: 6 months after successful debugging.
7. Debugging service and cost borne by Foreign:
7-1. The seller will send three or four technical workers (or more as buyer’s request) to the place which appointed by the buyer for the guidance of equipment installation and the debugging service;
7-2. Both buyer and seller should bear their corresponding charge as below:
7-2-1. The seller is in charge of the fee cost in China but except for the visa charge;
7-2-2. The buyer is in charge of the fee cost in Foreign and the visa charge. This fee includes but not limited to the followings:
a. Round-trip ticket;
b. Transportation, meals, accommodation and communication fee during business trip;
c. Allowance (manpower fee) USD 80.00 for per person a day (days calculation: total days from the day on the business trip to returning to China);
d. Translator: The buyer should hire a translator for the seller's technical workers convenient field work communication, and for completing the task successfully. Otherwise the seller will send an additional translator. The buyer should be in charge of this cost (refer to a~d).
Competitive Advantage:
1) Good performance
2) Long usage life
3) Good production stability
4) Reasonable design
5) High precision mold
6) Adopts AC frequency conversion technology
7) Uses imported electric components
8) Product characteristics:
a) Good foam
b) Smooth surface
c) Antibacterial
d) Wearable
e) Antistatic
f) Insulate
9) Widely used for agriculture and industry
10) Large marketing potential
Installing & debugging service:
1. After the contract is confirmed, the seller will supply the plan of the workshop, foundation chart and the chart of rubber roller, square axes & all kinds of rollers. All operation manual will be supplied by seller, too.
2. The seller will send 3-4 technical workers to guide installation and debugging for buyer;
3. The buyer should supply the spare pipes and electric wires, and the seller just advices the specification or the model of them.
Other terms:
1. Delivery period: totally 6 months after the contact is confirmed.
2. Payment: 30% of the total amount by T/T in advance as down payment, 70% of total amount by T/T before shipment.
3. Spare parts: The seller will provide a set of valueless vulnerable parts for free. The seller also suggests the buyer to buy a set of spare parts which meets one year’s use again. The seller will show the list of spare parts to the buyer for his choose before delivery.
4. Appearance and color: appearance and color of the machines are based on the seller’s standard. Of course, we can also custom-made according to buyer’s request.
5. Electric power: The quotation above is based on 380V/50Hz. There will be some additional fee and extended producing time for custom-built electric power requirement.
6. Warranty period:
6-1. Machines: one year after successful debugging;
6-2. Electrical components: 6 months after successful debugging.
7. Debugging service and cost borne by Foreign:
7-1. The seller will send three or four technical workers (or more as buyer’s request) to the place which appointed by the buyer for the guidance of equipment installation and the debugging service;
7-2. Both buyer and seller should bear their corresponding charge as below:
7-2-1. The seller is in charge of the fee cost in China but except for the visa charge;
7-2-2. The buyer is in charge of the fee cost in Foreign and the visa charge. This fee includes but not limited to the followings:
a. Round-trip ticket;
b. Transportation, meals, accommodation and communication fee during business trip;
c. Allowance (manpower fee) USD 80.00 for per person a day (days calculation: total days from the day on the business trip to returning to China);
d. Translator: The buyer should hire a translator for the seller's technical workers convenient field work communication, and for completing the task successfully. Otherwise the seller will send an additional translator. The buyer should be in charge of this cost (refer to a~d).