Add to Cart
TWP-200T | Type |
200 | Clapping force(TON) |
250 | Stroke(MM) |
550×560 | Working Plate Size(MM) |
355 | Dimeter of cyhnder(MM) |
10×2 | Horse powet(HP) |
25 | Heater power(KW) |
42 | Total power(KW) |
2RT/3RT/4RT | Type of mold openning |
7000 | Gross weight(KG) |
2900*2200*2000 | Machine size(MM) |
Vulcanizing machine daily inspection and maintenance A. routine inspection and maintenance 1) check whether the photoelectric mold closing device is sensitive and reliable; 2) check the part of the electric heating board to see whether the fixing of the electric heating board is firm and whether the wiring is short circuit; 3) check whether there is oil leakage in motor oil pump, piping and valve;4) check the height of fuel tank level;5) check the flow of cooling water;
6) check for abnormal sounds in motor oil pump, piping, valve, etc.;
7) the machine up and running, hours after the oil temperature should be generally within 35 ° C ~ 50 ° C;
8) check whether the system pressure is normal.
B. weekly inspection and maintenance
1) if the solenoid valve is heated, check its vibration and wiring;
2) whether the fastening screw of limit switch is loose;
3) whether the pipe joint is loose;
4) whether the filter is blocked.
C. Check and maintain monthly
1) check the oil pollution of the work;
2) cleaning inside and outside the machine;
3) check screw and barrel.
D. annual inspection and maintenance
1) whether the circuit wiring is loose;
2) setting state of limit switch;
3) check the wear condition of the mechanical part, whether the fixed screw is loose, and tighten it.